Project Experience

Water

Water and Waste Pump Houses and Treatment Facilities


About These Projects

Often the location of water and waste pump and treatment stations, in or near residential communities, combined with their 24 hour operation, results in extreme noise and vibration conflicts. Our experience includes noise control and vibration isolation design for new facilities and measurement and evaluation of existing noise and vibration sources both for the community and for the workplace.

BKL has experience in dealing with these issues as demonstrated by the following projects:

Common Acoustical Challenges:

  • 24-hour operation near homes
  • Generator, pump and fan noise
  • Ventilation and odour control systems
  • Property line bylaw limits
  • Construction noise
  • Workplace noise exposure

Aldrin Pump Station (formerly known as Duthie Pump Station)

Burnaby, BC

Noise prediction and noise migration design for noise from a new emergency generator, pumps and VFD fans.

Annacis and Lulu Island Sewage Plant Expansions

Delta and Richmond, BC

Acoustical design for control of both interior and exterior noise for major expansions to provide secondary treatment capabilities. To acquire the necessary noise data on secondary treatment equipment and cogeneration facilities, a noise survey was undertaken at the Bonneybrook Wastewater Treatment Plant in Calgary, Alberta.

Barnston/Maple Ridge Water Pump Station

Maple Ridge, BC

Baseline noise monitoring, noise control design of a new pump station, construction noise modelling and predictions, and design of methods for mitigating construction noise.

Burnaby Mountain Booster Pump Station

Burnaby, BC

Noise control design for a new booster pump station which consists of a new genset building and a pump room.

Central Park and Burnaby Mountain Pump Stations

Burnaby, BC

Acoustical studies of two existing pump stations with ventilation and noise issues. The post-mitigation assessment demonstrated that the acoustical treatment (e.g. lining, louvres, rebuilt entrance, replaced penthouse) reduced noise emanations to below ambient conditions at nearby residences.

Craigflower Pump Station

View Royal, BC

Measurement of ambient site noise and analysis of potential noise emanations from this pump station located in a quiet residential community.

Columbia Street Pump Station

Vancouver, BC

Site noise measurements and prediction of noise exposure during construction and operation of this downtown pump station. Attendance and presentation at community forum on perceived noise concerns about this project. Consultation on acoustical design of the facility.

Fergus Sewage Pump Station

Surrey, BC

Noise control design for a new sewage pump station which includes a genset building, odour control building and submersible pumps in a wet well.

Little Mountain Reservoir Reconstruction

Vancouver, BC

Prediction, assessment and mitigation of noise from a major construction project in the midst of an urban park and residential community. This project involved preparation of noise control specifications for the construction contract, participation in public open houses.

Okanagan Lake Pump Station

Kelowna, BC

Noise control for new lakeside pump station located within development site for future recreational properties and hotel. Noise levels of less than 40 dBA were achieved on the adjacent beach.

Port Coquitlam Sewage Pump Station

Port Coquitlam, BC

Noise control design for upgrading of the ventilation system, the new genset building, and installation of an odour control system for an existing sewage pump station. The post-mitigation assessment demonstrated that the acoustical treatment (e.g. duct lining, silencers, etc.) reduced noise emissions to below the bylaw limit at the property lines. A later study involved short term and long term measurements to investigate the noise concerns of nearby residences, design of additional noise mitigation and post-mitigation measurements.

Port Mann Water Supply Tunnel

Surrey and Coquitlam, BC

Baseline noise monitoring, construction noise predictions at commercial and residential receptors using Cadna/A software, and noise and vibration mitigation design (e.g. scheduling, temporary barriers, source orientation) for slurry tunnel boring project. Public open house attendance.

Royal Avenue Pump Station

New Westminster, BC

Noise control design for new standby generator set and odour control equipment in the replacement of an existing pump station in a quiet residential community.

Semiahmoo Sewage Pump Station

Surrey, BC

Noise measurement, noise predictions using Cadna/A software, noise impact assessment and noise mitigation design for the emergency generator and odour control system.

Seymour Shaft for Water Supply Twin Tunnels

North Vancouver, BC

Prediction, long-term monitoring and assessment of blasting noise received in a community during construction of an 11m diameter, 180m deep shaft within Lynn Canyon Park.

Featured Case Study

Gilbert Trunk Sewer

Gilbert Trunk Sewer

The Gilbert Trunk Sewer No.2 project is a critical infrastructure initiative by Metro Vancouver, involving the construction of a new sewer line parallel to the existing, deteriorating pipe that has reached its full capacity. The project spans approximately 6.2 km along Gilbert Road in Richmond, BC, with pipe diameters up to 1,800 mm installed at depths of up to 4 metres. The work includes the construction of six concrete diversion chambers at various intersections, and is divided into three main construction segments. The primary objectives of the project are to increase conveyance capacity, reduce the risk of backups, accommodate population growth, and provide system redundancy within the regional wastewater network. Construction activities took place in an urban environment, along a major roadway, and in close proximity to residential neighborhoods, making noise and vibration control a crucial factor in mitigating community impacts. The complexity of the construction operations – including utility conflicts, deep trench excavation requiring dewatering and sheet piling, and the continual movement of equipment along the pipeline route – introduced significant and variable noise and vibration sources. The project was required to comply with both the City of Richmond's Noise Bylaw and Metro Vancouver's Public Impact Mitigation (PIM) requirements, which together establish noise criteria for construction activities. These requirements include limits on noise levels from individual equipment and combined construction activities, as well as restrictions related to hours of work, and noise and vibration levels at noise sensitive properties and structures. Managing compliance across changing construction phases and locations required a proactive and flexible acoustical approach. As the acoustical consultant for the project, BKL proposed and implemented a construction noise and vibration assessment and management strategy designed to support regulatory compliance, risk management, and effective community relations. Our scope of services included: Working with AECOM and the project management team, our proactive acoustical consulting services delivered the following benefits: BKL's experience in construction noise and vibration assessment and management for complex infrastructure projects, combined with a strong understanding of local regulatory requirements, allowed us to tailor services to the mobile and phased nature of the work. Our acoustical consulting helped ensure that the Gilbert Trunk Sewer project not only achieved its infrastructure objectives, but also upheld Metro Vancouver's commitment to minimizing impacts on the surrounding community. Image courtesy of Jacobbros_construction Explore more projects here. Have a project in mind? Get in touch today.