Case Study

New Westminster Secondary School

Year Completed: December 2020
Capital Cost: $106.5 million
Total Area: 213,125.43 square feet
Category: Case Study, Education & Research, Building Acoustics

About the Project

New Westminster Secondary School is an educational facility in New Westminster, British Columbia, featuring a range of teaching, music, and performance spaces with varying acoustical requirements.

The school’s design required careful consideration of sound isolation between classrooms, reverberation control within teaching spaces, and background noise levels throughout the building. Specialized music rooms and a theatre introduced additional requirements for sound isolation, room acoustics, and mechanical noise control to support rehearsals and performances.

Our team provided acoustical consulting services throughout the schematic and detailed design phases, followed by site inspections during construction to review the implementation of the acoustical design requirements.

The project also presented challenges during construction, when a decision about material selection compromised the airborne sound isolation of the wall assemblies. We worked in close collaboration with the wider project team to deliver practical solutions that supported the acoustical design intent.

Scope of Services

We provided acoustical design reviews and construction services to address the requirements of the school’s teaching, music, and performance spaces.

The scope of work included:

Project Benefits

Through acoustical design, technical recommendations, and collaboration with the project team, we helped address the diverse acoustical requirements of New Westminster Secondary School.

Our work helped to: